Quantcast

Power Plant Operator Resume Middle east ...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title power plant operator
Target Location KW-middle east,europe,asia
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes
Click here or scroll down to respond to this candidate
Candidate's Name .R
Phone Number: PHONE NUMBER AVAILABLE, PHONE NUMBER AVAILABLE
Email Id: EMAIL AVAILABLE, EMAIL AVAILABLE



CAREER OBJECTIVE:

           To obtain the position of a Gas Turbine Control room operator / Field operator
(POWER PLANT) and use my knowledge and skills for the benefit of the organization and
further enhance my experience in machinery operations.

KEY SIKLLS:

     Extensive experience of a GAS TURBINE CCPP power plant industry and operating the
       gas turbines ccpp.

     Ability to work for long durations and perform physically enduring tasks.

     Excellent observational, analytical and problem solving abilities.

EDUCATIONAL QUALIFICATIONS:

   B.E (MECHANICAL) from P.S.N.A Engineering College, Madurai kamaraj University,

   EMPLOYMENT HISTORY:

Total Experience: 11 Years of experience in Gas Turbine Combined Cycle Power Plant.

           1. CONTROL ROOM ENGINEER / FIELD OPERATOR, Sai Regency Power
Corporation Pvt.Ltd,( OEG INDIA PVT LTD), 58 MW Ramanathapuram. June 2007 to till
date.

COMPANY PROFILE:

         Gas Turbine Model No : MS6001 FRAME 6 PG6581B (58 MW).

          MAKE                  : GE (BHEL).

          HRSG                  : ALSTOM 75 TPH.

          STG                   :   BHEL.

          GT control            : MARK-VI SPEEDTRONIC.

          STG control           : WOODWARD 505 & DCS: ABB 800Xa.

       GBC & IAC Make           :   DRESSER RAND GBC Working Pr 2 .
                                  IAC Working Pr 7.5 bar.




RESPONSIBILITIES:

         Operation and proper maintaining of GT,STG,HRSG and its auxiliaries.

         Start up and shutdown of GTG,STG,HRSG and auxiliaries.

         Operation and proper maintaining of Emergency diesel generator (650 kva) and load
         sharing system.

         Synchronizing the system with grid(11 kv,110 k v).

         All mechanical and electrical isolation and De-isolation for the startup and shutdown
         work.

         Operation and controlling of water injection system, water wash system, Air cooled
         condenser, Closed cooling water system, Vaccum pulling and lube oil centrifuge
         system.

         Carryout daily routine test and maintenance for GBC,IAC, Fire fighting system,
         ACC Systems.

         11 KV Switch gear operation and proper maintaining with PMCC 415 V.

         Isolation of 110 kv switch yard.

         Knowledge in desalination, water treatment (RO & DM).

         TO communicate and following instructions of the Shift in Charge to carryout duties
         efficiently and safely.

         To check process parameters and coordinate with the senior and inform superior for
         prompt action.

         Timely planning and execution of maintenance work with engineers to correct any
         deviations.

         To carryout routine checks on equipments for abnormalities

         Man power .
            Proper maintain Log books and records during shift operation activities.



2. FIELD ENGINEER / FIELD OPERATOR, VALUTHUR Gas based Combined Cycle
Power plant,(Sarveswaran Enterprises), 95 MW Ramanathapuram. 5.6.2004 to 31.05.2007.

           Gas Turbine              : FRAME 6 FA DLN-2 (60 MW).

            MAKE                     : GE (BHEL).

            HRSG                    : ALSTOM 120 TPH, 100 kg/cm2, 540 c.

            STG                     :   BHEL( 35 MW).

            GT control              : MARK-V SPEEDTRONIC.

      STG control                   : DCS: ALSTOM



DUTIES AND RESPONSIBILITIES:

         Boiler & turbine operation, hot & cold start up of boiler & turbine.
         Involved in Commissioning activities of combined cycle power plant.

           Handle emergency situations of Field operation confidently & continuously
           Moniter parameters of field operation.
           Implemented Standard Operating Procedures, equipment lockout tag out.
           Cordinate with Maintenance dept,to Perform the functions of troubleshooting and
            breakdown/preventive/corrective maintenance for reducing downtime to minimum.




   PERSONAL SUMMARY:

      Gender                            :     Male

      Date of Birth           :     26th Mar 1978

      Nationality             :     Indian.

      Marital status          :     Married.

      Country                     : India.
   Languages Known        :       ENGLISH and TAMIL.

   Passport Details       :       J2718706 and Valid up to JULY 2020.

   SKYPE ID                   :   rrarulsandiliyan

DECELERATION:

      I hereby declare that the information furnished above is true and correct to the best of
   my knowledge. I hope my application will meet with kind your approval.

                                  Thanking You



                                                             ( R.Candidate's Name  )

Respond to this candidate
Your Email «
Your Message
Please type the code shown in the image:
Register for Free on Jobvertise