| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidate Candidate's Name
Street Address Clydesdale Drive El Paso, TX Street Address
Tel: PHONE NUMBER AVAILABLE Email: EMAIL AVAILABLE Professional SummaryExtensive experience in Manufacturing, Industrial Engineering, ProductionControl, Quality Management, Quality Engineering and Warehousing.Successfully led, supervised, and trained diverse groups of employeesincluding Quality Engineers, Quality Inspectors, S.P.C. Technicians,Production Planners, Warehouse Workers, Shipping / Receiving Clerks,Production Workers and PPAP Coordinators.|AREAS OF EXPERTISE ||ISO13485, ISO19011, |Continuous Improvement / |Design of Experiments (DOE) ||TS16949, ISO9000, |Kaizen Activities |Measurement Systems Analysis ||ISO14971, ISO8423, |Process Development, |(MSA) ||ISO14001 |Management and Improvement |Statistical Process Control ||Code of Federal |Value Stream Management (VSM)|(SPC) ||Regulations (CFR) 820, | |Geometric Dimensioning & ||7, 11, 210, 211, 801, |Root Cause Analysis (RCA) |Tolerancing Techniques (GD&T)||803, 806, 807 and 821 |8D Methodologies | ||Medicines and Healthcare|Theory of Constraint (TOC) |Calibration and Gage Control ||Products Regulatory |Production Part Approval |Project Management ||Agency (MHRA) |Process (PPAP) |Methods Time Management (MTM)||Quality System |Advanced Product Quality | ||Inspection Technique |Planning and Control (APQP) |Total Productive Maintenance ||(QSIT) |Failure Mode & Effects |(TPM) ||Six Sigma / Lean |Analysis (FMEA) and Control |Customs - Trade Partnership ||Manufacturing / 5S |Plans (CP) |Against Terrorism (C-TPAT) ||Verification and |Total Quality Management | ||Validation (V &V) |(TQM) | ||Corrective and |Toyota Production System | ||Preventive Action (CAPA)|(TPS) | | Microsoft, Excel, Word, PowerPoint, Access, Visio, Project and Outlook Minitab . . InfinityQS . . Oracle . . Pilgrim . . iGrafx FlowCharter. .SAP Education, CERTIFICATION and AFFILIATION . B.S., Quality Control, Warren National University, Cheyenne, WY, 2007 . Industrial Engineering Technology, Nassau Community College (SUNY), Uniondale, NY (3 years) . Mechanical Engineering Technology, New York City Technical College (CUNY), Brooklyn, NY (2 years) . Certified Six Sigma Green Belt (CSSGB), Lean Six Sigma Green Belt (LSSGB), Certified Quality Auditor (CQA), Certified Quality Engineer (CQE), and Certified in Production and Inventory and Management (CPIM) . Quality Assurance and Management, American Society for Quality (ASQ) - Long Island, N.Y. Chapter (3 years) Professional experienceSQA SERVICES INC - PHILIPS HEALTHCARE, Highland Heights, Ohio Jun. 2014 - Feb. 2015Senior Supplier Quality Engineer Jun. 2014 - Feb. 2015Qualify all products through the review and acceptance of PartSpecification Verification (PSV) reports to confirm stock/product meetsspecification via inspection data on a sample of the stock. Assuresuppliers demonstrate readiness to manufacture production parts usingagreed process criteria and controls as well as production machinery andtooling as per the Supplier Part Qualification (SPQ) process. Inconjunction with distribution and logistics, assure product meetsrequirements and specifications prior to receiving, staging and deploymentfor production. Support the development and approval of Process ValidationProtocols and reports at suppliers as required. Mar.2011 - July 2013Candidate's Name Page TwoCAREFUSION, El Paso, TX Mar.2011 - Jul. 2013Surveillance Analyst Post-Market Apr. 2013 - Jul. 2013Responsible for post-market surveillance, signal detection (complaints,adverse events), field corrective action/recall management, domestic andinternational customer and agency notifications / communication, failureinvestigation / root cause problem solving, and risk management incompliance with regulatory requirements. Also developed post-marketsurveillance metrics and measurement systems (i.e. trends) that enablemeaningful strategies to be constructed for optimal root cause resolution,customer satisfaction, and regulatory compliance in support of the businessunits.Senior Quality Engineer - Customer Advocacy Jul. 2012 - Apr. 2013Performed product and service quality evaluation and control to assurecompliance to the work standards. Involved in resolving the equipment andprocess-related production issues, activities including equipment, process,materials and method validation as well as statistical analysis and metricsto analyze those systems and processes being measured.Quality Analyst - Regulatory Mar. 2011 - Jul. 2012Managed the Internal and External Audit processes to determine theeffectiveness of the Quality Management System (QMS). Verified CorrectiveAction Plans and their objective evidence to assess how successfullyprocesses have been implemented. Reviewed and analyzed quality inspectiondata to find specific types of quality problems the department or companyis experiencing. Conducted Internal Quality Audits to assure the QualityManagement System complies with regulatory requirements.MANPOWER - PENSKE, El Paso, TXOct. 2010 - Mar. 2011Quality AuditorConducted product and supporting documentation assessments to assureaccuracy and completeness prior to shipping or receiving.Yazaki of North America, El Paso, TX Aug. 2000 - Feb. 2009Warehouse Supervisor Aug. 2006 - Feb. 2009Planned, staffed, organized and controlled the warehouse operationsincluding shipping and receiving of parts and material, as well as stockedinventory. Prepared and issued stock releases, maintained prescribedinventory stock levels, and pack / ship customer orders.Customer Service Quality Supervisor / Inspection Supervisor Jan. 2003 -Aug. 2006 Directed Customer Service Quality Department to includeQuality Engineers, Incoming Inspection, Quality Control and TechnicalDocumentation to include PPAP Sections. Supervised and trained 8 directemployees aw Was responsible for the Customer Service Quality section toinclude: Customer Quality Engineers, Quality Inspectors, and a DocumentControl Clerk, as well as up to 30 Re-work and Sorting Quality Inspectors.SPC Coordinator / Quality Engineer Aug. 2000 - Jan. 2003Supported Operations and Engineering with data analysis of processcapability indexes, gage effectiveness, and generally assisting withidentifying, analyzing and developing improvements in productivity,quality, and client relationships. Conducted Supplier Audits to assure thesuppliers adhere to product specification and requirements. Also conductedSupplier Assessments to approve new suppliers, as well as interfaced withexisting supplier base. Served as a member of the APQP Team. Successfullyled several Six Sigma, Kaizen and Lean projects.ACER - Aii Technologies, El Paso, TX Aug. 1998 - Jun. 2000Quality Assurance Engineering SupervisorMarui Mfg. Co., El Paso, TX Mar. 1998 - Aug. 1998Production Support ManagerLeviton Mfg. Co., Little Neck, N.Y. and Brooklyn, N.Y. Aug. 1989 - Mar.1998Senior Quality Assurance Engineer June 1995 - Mar. 1998Industrial Engineer Aug. 1993 - Jun. 1995Production Planner Aug. 1989 - Aug. 1993 |