| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidate|Candidate's Name Piping ||Designer ||Street Address , PHONE NUMBER AVAILABLE, ||EMAIL AVAILABLE ||Objetive ||PERFORMS PIPING DESIGN AND CHECKING ASSIGNMENTS WHICH REQUIRE THE ||APPLICATION OF FUNDAMENTAL TECHNIQUES IN ACCORDANCE WITH COMPANY AND ||INDUSTRY STANDARDS AND CODES. WITH OVER FIFTEEN YEARS OF EXPERIENCE WITHIN||INDUSTRIAL OIL & GAS AND CHEMICAL PROCESSING INDUSTRIES. ||Professional Summary ||Design 3D model equipment arrangement and piping system plant layout, ||instrumentation, civil and structural supports for Oil, Gas, LNG, ||Petrochemicals, pharmaceutical and industries facilities. ||Develop the design of complex piping models given basic information such ||as P&IDs, GA drawings, piping specifications and equipment arrangements. ||Checking 3D modeling for construction request information with application||of basic engineering principles, material properties, and an acquaintance ||with construction, installation, and maintenance procedures. ||Checking isometrics , documents, piping layouts, orthographic, and ||alignment drawings, for scope, presentation and technical accuracy prior ||to issue ||Produce the Bill of Material and other construction documents. ||Produce hand isometric sketches in field as well as isometric drawings ||from piping models. ||Preform activities, P&ID Field walk downs, Client 3D Model reviews, w/ ||Navisworks and Smart Plant Review. ||Responsible for Field Support, Coordination with contractors to solve ||field/design issues and review vendor equipment drawings ||Skillful Plant 3D, SP3D, PDS , CADWorx, and 2D CAD, & Microstation, ||Skillful LFM laser scanning software to create 3D models on PDS, CADWorx, ||SP3D ||Applicable Design, Material, Dimensional requirements, Construction, ||welding corrosion, and testing of the use of ASME B31, API Code and ||standards for Pressure Piping system ||EDUCATION ||ASSOCIATE DEGREE PROCESS PIPING DESIGN ENGINEERING TECHNOLOGY / 2009-12 / ||LEE COLLEGE / BAYTOWN TX USA || ||Bachelor in Agricultural Mechanic Engineering / 1983-88 / Universidad ||de Guadalajara || ||CADWorx Certificate / 2002/ Horn Drafting & CAD School Center ||Level II Process Piping Designer /2002/ Society of Piping Engineers and ||Designers (SPED) ||EXPERIENCE ||01/06/2014 to 9/4/2015|Part Time/Lee College | || | |Baytown, TX ||NCCR Piping Designer and pipe instructor with Plant 3D ||(NCCR) Pipe Fitter Instructor / 2672900 / The National Center for ||Construction Education and Research ||3/16/2015 to 9/4/2015 |Wood Group Mustang | || |Engineering |Katy, TX ||Piping Designer PDS /SP3D ||Air Products Pasadena PMD Project Revamp Utility, Non Hydrogenation ||Reactor, and Hydrogenation plant ||10/04/2014 to |Fluor Corporation | Sugar||3/27/2015 | |Land, TX & Calgary CA ||Lead Piping Designer PDS ||Flint Hill Resources Houston, TX. / FEED according Flint Hill's goal to ||maximize the capacity of Catofin reactor ||03/3/2014 to |Jacobs Engineering | Houston, Texas City, ||10/01/2014 | |Corpus Christi, TX. ||Lead Piping Designer PDS /SP3D ||Flint Hill Resources Corpus Christi, TX. / East Domestic Crude Project, ||Vaccum, & Sulfur Recovery ||11/4/2013 to |S&B Engineering | ||03/10/2014 | |Longview, TX ||PIping Designer Bentley AutoPlant 3d ||Texas Eastman and Flint Hill capital and maintenance projects and product ||and Farm Tank & Utilities ||07/6/2013 to 10/27/2013|Worley Parsons | || | |Houston, TX ||Piping Designer CADWorx ||LNG Centurion Midland TX Station ||02/5/2013 to 07/01/2013| Technip | || | |Houston, TX ||PIPING DESIGNER & FIELD PIPING DESIGNER SP3D, PDS ||Projects: Nexen Diluent Recovery Unit (DRU) Expansion / Flint Hill Ethane ||Fee Flex Demeth ||Exxon Baytown new unit for Centurion oil plant ||06/17/2011 to 02/01/2013|Canadian Natural Resource L.| Fort Mackay || | |Alberta CA ||PIPING DESIGNER & FIELD PIPING DESIGNER CADWorx, and SP3D ||Plant site Downstream Coker Expansion Unit Projects: Crude, Vaccum, Delayed ||Coking, Hydroteating, Sulfur Recovery, Sour Water Stripping, Amine Recovery ||and Utilities ||Solving RFI's for piping contractibility and operation & Create isometric ||field revision ||Produce, organize and controlling master drawing such as P&ID, Isometric, ||Structural, Civil Drawing. Supervising the pipe installation and assembly ||06/21/2010 to 06/3/2011 |Shaw Group | || | |Texas City, TX ||PIPING DESIGNER CADWorx, and PDMS ||Marathon Petroleum Corporation site Plant ||02/17/2007 to 5/3/2010 |URS & Washington Group | || | |Denver, CO ||PIPING DESIGNER & FIELD PIPING DESIGNER CADWorx, PDS ||Suncor Firebag 3 Cogen Plant, Unit 191/2/3/4, and Exxon Mobil Unit ||Controlled Freeze Zone CFZ., and Natural Gas ||9/3/2006 to 10/01/2007 |Jacobs Engineering | || | |Baytown TX ||Lead Piping Designer PDS /SP3D ||Bayer Plant, Makcralon Unit, ||3/04/2004 to 8/15/2006 |Arctic Slope Regional Corp | || | |Prudhoe Bay, AK ||PIPING DESIGNER & FIELD PIPING engineer BENTLEY CADWorx ||Multi projects for capitol and maintenance compressor, burning systems, ||tanks, and pump station ||2/10/2002 to 2/23/2004 |Modern Continental | || | |Lorton County, VA ||FIELD PIPING DESIGNER CADWorx ||Lorton Water Plant treatment Facility ||1/20/2000 to 2/1/2002 ||SEMCO LLC ||John Lafitte, LA || ||PIPING Designer BENTLEY AUTOPLANT 3D ||Project Dixie Patriot 2 lift boat three legs, 280 ft. long and 8.5 ft. wide ||jacked up || ||1/20/2000 to 2/1/2002 Enpro System ||Channelview TX ||Vessel Quality assurance and drafter CAD ||Produce dimensional mechanical drawing for vessel, tanks, exchangers, FCCU ||valves, Reactors, Fractionators, Columns, Drums fabrication/ASME, Design ||internal and structural attachments, ladders, platforms and handrails, || ||05/99-05/01 Cana-Tex ||Multi field Projects all over US ||QA/QC Field Drafter estimation and planning || ||8/99to 5/00 United Industrial Service, Inc. ||Multi field Projects all over US ||Field exchanger Pipe estimator and Exchanger Fabricator ||Shop projects for Valero Houston ||Vessel fabrication to produce mechanical drawings || ||3/89 to 7/98 Flour Daniel ||La Port, TX; ||Pipe fabricator ||Project Solvey, Rohm & Hass, and Chevron || ||12/97 to 6/98 Cheminthon Constructors, LLC - ||Bay Area Texas || ||Pipe fabricator ||Project Centurion Plant ||6/94 to 12/97 S&B Engineers, ||Pasadena Refinery Coker Plant || ||Pipe Fabricator and Instrument ||Coker Unit Houston Refinery Lindell ||6/93 to 12/94 Becon ||LaPort, TX ||Pipe Fabricator ||Rohm & Hass ||12/92 to 5/93 Mundy Co. - ||Pasadena, TX ||Celanese Bay Area ||Pipe Fabricator ||1/92 to 7/92 Afton Pomp - ||Houston, TX ||Pipe Fabricator ||Fab Shop ||3/90 to 12/90 Ref-Chem - ||Pasadena, TX ||Pipe Fitter Fabricator ||Kaneka |REFERENCES . DANA CAUDLE-BYAL CADD Engineering Technology Lead Instructor Lee College in Baytown, TX Contact phone Number: PHONE NUMBER AVAILABLE Email EMAIL AVAILABLE Office: ATC228-B . Name: Cindy Cash Company: WG Mustang Engineering Job Title: Principal Piping Designer Contact Telephone Number: PHONE NUMBER AVAILABLE Email: Cash. EMAIL AVAILABLE . Ann Williams URS Canadian Operations, Ltd. Project Information Supervisor Denver , CO 80237 Cell PHONE NUMBER AVAILABLE email EMAIL AVAILABLE . Name: Rogelio Perez Company: WG Mustang Engineering Job Title: Pipe Designer Contact phone Number: PHONE NUMBER AVAILABLE Email: EMAIL AVAILABLE |