Quantcast

Industrial Engineer Continuous Improveme...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Industrial Engineer/Continuous Improvement Intern
Target Location US-TX-Arlington
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes

Process Engineer, Continuous Improvement Engineer, Industrial En Fort Worth, TX

Program Management Director Industrial Engineering Dallas, TX

Manufacturing Manager Industrial Engineer Weatherford, TX

Industrial Engineer Dallas, TX

Hse Advisor Industrial Engineering Dallas, TX

Devops Engineer Azure Cloud Dallas, TX

Product Development Engineering Colleyville, TX

Click here or scroll down to respond to this candidate
                     Candidate's Name
Street Address                  E-mail     : EMAIL AVAILABLE
Phone: (682) 559-9427                                              LinkedIn   : https://LINKEDIN LINK AVAILABLE

Summary
A zealous, passionate Industrial Engineer with practical experience and special skills in Lean Manufacturing, Quality
Systems, Process Improvement, Manufacturing Engineering and Supply Chain. Recipient of two awards for major
implementations during internship programs.
Skill Set
Design tools           : SolidWorks, Solid Edge, CAD-Ian, AutoCAD
Simulation tools        : Arena Simulator, WITNESS Simulator, Automation Studio
Data analysis tools     : MATLAB, Weka, SAS, Minitab
Other skills            : Advance Excel (Macros), SQL, MS Office Suite, MS Visio, AIAG Core tools
Education
Master of Science in Industrial Engineering                                                                August 2014
                       December 2016
University of Texas at Arlington, Texas, USA                                                                      GPA
                       3.829 on 4.0

Honors: Lean Six-Sigma Green Belt  ISCEA                                             License Number: 251  3141; Validity
May 2018

Bachelor of Science in Mechanical Engineering                                                                   August 2010
               May 2014
Amrita Vishwa Vidyapeetham, Coimbatore, India                                                                        GPA
              7.53 on 10.0

Professional Experience
Industrial Engineer (Continuous Improvement) Intern
Pottorff, Inc  Fort Worth, Texas                                                                                  December
2015  May 2016
            Designed and developed the first assembly production schedule tool for the HVAC industry using Lean
      techniques, which balanced the line automatically with required labor, workstations and drop-off rate based on
      the product. Increased productivity up to 15% with the new scheduling and sequencing process
            Implemented lean methods to reduce waste, designed non-conformance zones & process, performed
      CAPA investigations including Root Cause Analysis (5 Why, Fishbone) to identify the source of problem
      during every Kaizen meeting
            One of the key players in implementing the Single Piece Flow methodology
            Made a Value-Stream map which depicted value added, non-value added and auxiliary waste in the
      process line
            Developed a new material picking chart for the aluminium extrusion louver line and eliminated errors
      in material picking
            Re-designed the layout of 2 major product lines  Louvers and Ceiling Fire Damper
            Performed calculations with Industrial Engineers such as labor cost savings, time savings, takt time,
      productivity, payback period, productivity gain per year for making decisions such as purchasing new
      machinery
Industrial Engineer Intern
Pottorff, Inc  Fort Worth, Texas                                                                                           June
2015  July 2015
             Performed time-study on 12 process lines throughout the plant
             Implemented 6S, JIT techniques, designed - fabricated transport carts to facilitate motion of parts
      within the facility
             Designed a new Kanban process for a high-volume damper line that demands continuous flow of parts
             Created Standard Work Instruction Sheets which serves as a working manual for the operators in the
      line
Process Improvement Intern
Best Engineers Pumps Pvt Ltd  Coimbatore, India                                                                                       January
2014  April 2014

             Workflow assessment across the plant by using Arena Simulator to check the actual output that could
       be generated with the existing flow
             Performed bottleneck analysis and eliminated them by regulating workflow across the line through
       work balance among machines and operators
             Designed a specialized ERP software for the company
             Made and analysed the Value  stream map, thereby increasing the output by eliminating non-value
       added activities
      Used operation research techniques to facilitate proper allocation of work to machines



Manufacturing Engineer Intern
Pricol Ltd  Coimbatore, India                                                                  April 2013  May 2013
            Designed and fabricated a semi-automated pneumatic bush crimping machine used to crimp bushes to
     the axle of an odometer and replaced the manual machine that served as a bottleneck.
            Reduced the pressure variation caused by manual crimping by setting up pressure valves attached to the
     crimping machine to facilitate uniform pressure. This reduced defects caused by variation in pressure and
     increased flow of work in the line.
Quality Engineer Intern
SJS Enterprises Pvt Ltd  Bangalore, India                                                                                         April 2012
May 2012
             Performed defect analysis and used Pareto charts to identify the defects that has the most occurrence.
             Used Six Sigma principles such as brainstorming techniques and Root Cause analysis for problem
       solving. Implemented Statistical Process Control Charts in the process lines for visual process analysis and
       reasoning.
             Used regression analysis on quality parameters. Reduced 4.5% of the production costs by working with
       the manufacturing department to produce defect free parts.
Projects
               Trade impact of Panama Canal expansion on the Port of Los Angeles  Supply Chain Study
       June 2016 - July 2016
                          Current trade scenario, facilities and features at the Port of Los Angeles. Import export analysis through the port.
                          New features offered by Panama Canal. Logistics advantage in terms of Quantity and its impact on the Port of Los
                Angeles.

                Conveyor Belt - Project Management using MS Project                                                                    August
              - December 2015
       2015
               Developed a plan for the project, created work breakdown structures and work elements - created project teams, assigned
       resources for activities, checked the inter-relationship between departments.

               Scheduled the project using Gantt charts for an early finish without conflicts between resources.

               Quality Analysis using Six Sigma methodology for Eaton, India                                                          October
       2015 - December 2015
               Analysed the problems in a tandem gear pump due to oil leakage, adopted DMAIC technique to implement the solution.
                                                                                                                                  Data
       collection, Analysis, repeatability and reproducibility measures to evaluate measuring techniques, used Pareto charts, fish-bone diagram
       for Cause and effect relationship, FMEA, brainstorming sessions, performed 8D analysis etc.

               Facility Design for ACME footwear                                                                                       August
       2015 - December 2015
               Analysed the current ACME footwear facility, determined inter-relationships between departments.
             Computed the annual growth till 2018, designed a new facility by calculating area requirements pertaining to each department,
    floor space, goods storage, rack, pallets, holding cost, labor and equipment required to run the facility etc. Determined the total area of
    the facility and the cost that would be incurred to purchase land, equipment and additions for the facility.

            Simulation                   Model                of             a            Semi-Conductor                       I ndustry
    January 2015  May 2015

           Created a process map which established the work flow. Designed simulation models with varying machine and labor count.
    Checked machine utilization factors. Maintained the objective of increasing process efficiency with effective line balance.
           Simulated the models to determine ideal output that could be achieved at low cost. Used multiple mathematical functions to
    determine accurate results in reality.

            Multiple Linear Regression Analysis of NBA tournament                                                                     October
    2014 - December 2014
            Performed data analysis, checked for correlation between variables, created an equation to predict the total points scored by a
    team in NBA with respect to 4 variables  matches played, rebounds, field throws made, field goals made with high accuracy.

            Value Stream Map of a leading restaurant chain                                                                         September
    2014 - December 2014
            Analysed the entire process, categorized steps into value added and non-value added. Re-designed procedures to eliminate
    waste from the process.

            Design of a safety fixture for the rivet machine  John Deere line, Pricol  India
    April 2013 - May 2013
            Designed and fabricated a poke-yoke type safety fixture based on worker ergonomics. Minimized hazards such as riveting on
    the finger. Received appreciation for design from manufacturing engineering team.

Awards and Recognition
            Best Implementation Award - Pricol Ltd
    May 2013
    Design-fabrication of a semi-automated crimping machine used to crimp bushes to axles of odometers used in
    automotive
            Best Student Intern - SJS Enterprises Pvt Ltd
    May 2012
    For the research contributed to minimize defects.
    Combined efforts with quality engineers to employ statistical methods related to manufacturing processes.

Respond to this candidate
Your Email «
Your Message
Please type the code shown in the image:
Register for Free on Jobvertise