Quantcast

Masters Student Resume Columbus, OH
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Masters Student
Target Location US-OH-Columbus
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes

Scrum Master Columbus, OH

Scrum Master Project Management Pickerington, OH

Scrum Master Test Lead Lewis Center, OH

Scrum Master Software Development Columbus, OH

Pre-Med Student Columbus, OH

Scrum Master Software Engineering Columbus, OH

College student majoring in Business Management and Finance Dublin, OH

Click here or scroll down to respond to this candidate
Candidate's Name
Street Address  | EMAIL AVAILABLE| PHONE NUMBER AVAILABLE
EDUCATION
Masters of Science in Industrial and Systems Engineering Aug 2015 - May 2017
The Ohio State University, Columbus, Ohio
Bachelor of Engineering in Mechanical Engineering, GPA: 3.94/4 Aug 2010 - Apr 2014
Sri Sairam Engineering College (Anna University), Chennai, India
PROFESSIONAL EXPERIENCE
StarTech.com - Lean Six Sigma Green Belt Capstone project. (Student Project Consultant) Aug 2016 - Apr 2017
- Streamlining the workflow of the reverse logistics and reducing the non-value add in the returns process.
- Enhancing the throughput of the quality lab.
- Performing operational analytics.
- Redesigning the warehouse and improving the warehouse utilization.
Pontiac Coil. Inc.: 5800 Moody Dr, Clarkston, MI 48348 (Engineering Intern) May 2016 - Aug 2016
- Optimization of processes by identifying bottlenecks and improving throughput.
- Designing a process for the transition of a prototype into live production.
- Designed and recommended modifications to existing plant layout and the engineering lab.
- Building prototypes and performing tests.
FlashGlobal SDA, LLC   Warehouse Process Flow Improvement (Student Project Consultant) Jan 2016 - May 2016
- Conducted time-studies, simulated the process environment, and identified bottle-necks in the process.
- Analysis of Current value stream and build a Future state value stream map for the warehouse.
- Designed, recommended, and developed an improved process layout.
ROVI Corporation: SPi Global, India. (Schedule Analyst) Dec 2014 - Jul 2015
- Was assigned 40 PBS channels, the ION network and its affiliated channels.
- Developing schedules and recommendations for the channels along with performing Quality Analysis.
- Maintaining client relationships with the assigned channels.
- Headed a team of 7 other schedule analysts.
ACADEMIC PROJECTS
Space Shuttle ME   Design of Experiments Capstone Project
- Determineetermine etermineetermine etermined if any of the 8 factors effects variation in t if any of the 8 factors effects variation in t if any of the 8 factors effects variation in tif any of the 8 factors effects variation in tif any of the 8 factors effects variation in t if any of the 8 factors effects variation in tif any of the 8 factors effects variation in t if any of the 8 factors effects variation in tif any of the 8 factors effects variation in tif any of the 8 factors effects variation in t if any of the 8 factors effects variation in tif any of the 8 factors effects variation in t if any of the 8 factors effects variation in t if any of the 8 factors effects variation in t if any of the 8 factors effects variation in t if any of the 8 factors effects variation in tif any of the 8 factors effects variation in tif any of the 8 factors effects variation in t if any of the 8 factors effects variation in tif any of the 8 factors effects variation in t if any of the 8 factors effects variation in tif any of the 8 factors effects variation in tif any of the 8 factors effects variation in t if any of the 8 factors effects variation in t if any of the 8 factors effects variation in t if any of the 8 factors effects variation in t if any of the 8 factors effects variation in t if any of the 8 factors effects variation in t he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A he left & right engine thrust. A modelmodelmodelmodelmodel was developedwas developedwas developedwas developed was developedwas developedwas developedwas developed was developedwas developed (first or second order), e (first or second order), e (first or second order), e (first or second order), e(first or second order), e (first or second order), e(first or second order), e(first or second order), e (first or second order), e(first or second order), e (first or second order), e (first or second order), e(first or second order), e (first or second order), equation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and quation for each engine thrust and the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow the optimal settings for input factors that allow each eneach en each en gine thrust to gine thrust to gine thrust to gine thrust to gine thrust to gine thrust to gine thrust to operate at its nominal value.operate at its nominal value.operate at its nominal value.operate at its nominal value. operate at its nominal value. operate at its nominal value. operate at its nominal value. operate at its nominal value. operate at its nominal value. operate at its nominal value.operate at its nominal value.operate at its nominal value. operate at its nominal value. operate at its nominal value.operate at its nominal value. operate at its nominal value.operate at its nominal value.
SigmaBrew   Process improvement Simulation Project
- Improving the customer satisfaction by reducing the service time. Determining the factors affecting the service time and improvements were made to reduce it and subsequently improving the business of SigmaBrew.
Parameter optimization using mathematical methods
- Performed Friction stir welding on 36 samples of AA8011 & AA6061 by varying the rotational speed, pressure and the traverse speed. ANOVA was implemented to find the best weld quality and the process was optimized.
INTERNSHIPS
 Voltech Manufacturing Ltd Sep 2014 - Oct 2014
o Worked under Quality manager of procurement team in inspecting the process instruments, panels and hardware materials.
 KVK   Nagai Power Pvt Ltd Nov 2013 - Dec 2013
o Student intern under the Operations team and was involved in the structural fabrication and erection works.
 Reliance Steel Corporation Jul 2011 - Aug 2011
o Student intern performing cold rolling of sheet metals and lathe operations including quality tests.
ADDITIONAL INFORMATION
 Computer Skills: Python, C, C++, SAS, Minitab, Simul8, Arena, AutoCAD, ProE, Ansys, Microsoft office.
 Diploma certification in ERP Production Planning
 Graduate Teaching Associate for an undergraduate Industrial and Systems Engineering Course

Respond to this candidate
Your Email «
Your Message
Please type the code shown in the image:
Register for Free on Jobvertise