Summary of Qualifications
- Drilling & Completions engineering, project management and onsite supervision experience.
- Land and Offshore wells engineering & operations.
- Vertical, ERD, Horizontal, HPHT, Conventional/Heavy/Thermal Oil & Tight gas wells.
- Land Rigs, Mobile Drilling Units, Coil Rigs, Slant Rigs, Workover Rigs.
- Conventional and Cyber type Offshore Platforms, Jack-ups and Semi-Submersibles.
- Exploration, Appraisal, Development and Brownfield operations.
- Well planning and cost estimation.
- Drill string design and application modeling, Underbalanced and managed pressure drilling.
- ERD, ultra-deep casing and cement design.
- Extensive HTHP planning and drilling operations utilizing geomechanical models built with seismic and all other
types of pre-drill formation evaluation information
- Horizontal drilling and completion experience including Gravel Pack, Expandable Sand Screens and multi-stage
fracturing completion technology.
- Deepwater drilling design and operations.
- Well de-completion and abandonment planning and operations
- Advanced safety audit and hazard assessment.
Education & Certificates
- MSc, Mining Engineering, Azerbaijan State Oil Academy
- IWCF Well CAP Well Control, Surface/Subsea Supervisor
- ENFORM 2nd Line Supervisor s Well Control, IRP-7
- Offshore Survival, BOSIET
References
- Jason Savage, Wells Superintendent, Devon Canada, PHONE NUMBER AVAILABLE, EMAIL AVAILABLE
- Hank Vrielink, VP Wells, BP Canada , PHONE NUMBER AVAILABLE, EMAIL AVAILABLE
- Dennis High, Driling Engineering TL, BP Canada,PHONE NUMBER AVAILABLE, EMAIL AVAILABLE
- Maget Farahat, Wells Superintendent, Husky Energy, PHONE NUMBER AVAILABLE, EMAIL AVAILABLE
- John Pahl, Strategic Account Manager, Baker Hughes Canada, +1(403)512-4275, EMAIL AVAILABLE
Experience
June 2014 - Oct 2014 Wellsite Coordinator (Field Superintendent) Baker Hughes Canada
- Hired to provid operational and engineering support to Kitimat IPM project, BC Foothills, Western Canada.
- Successfully delivered 3 x HPHT horizontal shale gas wells (up to 6,500 mMD, 2,900 m departure, 160-180 degC /
10,000psi) utilizing MPD rigs and multi-stage fracturing completions in areas with severe losses/WBS and well
control challenges.
June 2013 - May 2014 Senior Drilling Engineer BP Canada (Devon Energy JV)
- Successfully planned and delivered 26 x Vertical/Directional/ERD appraisal and delineation wells in areas with
shallow artesian flows, severe losses and wellbore stability issues utilizing Slant/Coil rigs, Pike/Jackfish SAGD
projects, Northern Canada.
- Successfully planned and executed 3 x non-routine wells abandonments for Terre de Grace Thermal Oil project in
compliance with Government Regulatory (AER) requirements, Northern Alberta, Canada.
Aug 2010 - June 2013 Drilling Supervisor BP Caspian Sea
- Successfully delivered 6 x ERD wells (water depth 180m, 10,000 psi BHP,up to 6,700 mMD with 3,400 m
departure) with open hole gravel pack and expandable sand screens completions in areas with complex wellbore
stability issues and repeated anticlinal beds.
- Supervised Rig upgrade and Rig commissioning activities on Conventional/Cyber type offshore platforms.
Coordinated Well Interventions/Workovers SIMOPS operations.
Jun 2008 - Aug 2010 Drilling Engineer BP Caspian Sea
- Successfully developed and implemented Basis of Design for key services - ERD Casing Design, Cementing,
Drilling Fluids, Bits and Drilling Equipment design for offshore Caspian Sea development projects.
- Provided technical integrity assurance to ERD wells design, Conventional and Cyber-type offshore platforms.
Feb 2006 - May 2008 Senior Drilling Engineer Schlumberger Russia
- Successfully planned and executed 49 x Horizontal wells and sidetracks (5,000psi BHP, up to 3,000 mMD with
800m departure) utilizing MDUs and Conventional rigs, West Siberia IPM project.
- Reduced costs in field development drilling by 20% implementing Rotary Steerable and stage cementing techniques.
Aug 2002 Jan 2006 Drilling Engineer/Drilling Supervisor BP Caspian Sea
- Successfully planned and executed 12 x ERD and Horizontal HTHP Oil/Tight gas wells (water depth 100-600m,
BHP 8,000-21,000 psi, up to 7,500 mMD with 6,300m departure) using rotary steerable systems in area with
complex wellbore stability issues.
- Planned and executed Coiled tubing well intervention and Directional driving of 24 conductors to depths of up to
450m.
Jan 2000 - Aug 2002 Field Engineer Baker Hughes Azerbaijan
- Provided engineering and technical support to Fishing and Liner Hangers running applications.
- Supervised Liner Hangers & OHGP/DHSV running operations, different types of Fishing operations, Jack-up,
MODUs ( ERD wells) and Land rigs (Vertical / Deviated wells).
March 1997 - Jan 2000 Service Engineer Schlumberger Azerbaian
- Provided engineering technical support to MWD/LWD & DD operations, onshore/offshore Azerbaijan.
- Established R&M solution database rating performance, testing, and collecting data on new tool configurations.
July 1993 - Feb 1997 Drilling Engineer SOCAR Azerbaijan
- Provided engineering / optimization support to drilling, completions and workover operations for vertical and
deviated (<2,000 mMD, up to 2,500 psi BHP) Conventional/Heavy oil wells, onshore/ offshore Azerbaijan.
4
|