Quantcast

Project Engineer Resume Calgary, AB
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Project Engineer
Target Location CA-AB-Calgary
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes
Click here or scroll down to respond to this candidate
                                                             Candidate's Name

        Street Address  Somerside Park SW Calgary, AB T2Y3G6, CA HPHONE NUMBER AVAILABLE , CPHONE NUMBER AVAILABLE  EMAIL AVAILABLE

OBJECTIVE: Petroleum Engineer

PROFESSIONAL SUMMARY
 Professional engineer with expertise for drilling and completion design and operation, extensive experience in well testing
 operation, well optimization operation and formation damage evaluation, hand on experience of study of formation rock
 properties and formation fluids. Petroleum Engineer hand with 32 years of experiences in petroleum engineering design and
 operations. Areas of expertise include Drilling & completions design/operation; Production optimization and stimulation and
 perforating; Artificial lift design in sucker rod/gas lift/plunger/hydraulic lifting; Well test design and pressure transmit analysis.
 Detail-oriented petroleum engineer with strong educational background in petroleum engineering and supported by field
 research and professional work experience in oil and gas industry.


SKILLS
    Technology study and development and                               Artificial Lift design in sucker rod/gas
        engineering operation                                            lift/plunger/hydraulic lifting.
        Production optimization and                                      Drilling & completions design/operation
        stimulation/perforating,                                         Risk assessment (HAZOP) and studies
        Well test design and pressure transmit analysis                  Project Management
        Well control specialist and Borehole stability                   Strong learning and troubleshooting ability
        Multidisciplinary


REFERENCES
 REFERENCES Available upon request


WORK HISTORY
Project Engineer                                                                                                   2007~present
Core Laboratories Canada Ltd.                                                                               Calgary, AB Canada
      Project analysis, organization, scheduling; Results evaluation/report finalization.
      Expertise and conduct advanced rock and fluids (include oil/gas/water) analysis. Contribute revenue 10% increased
         annually.
      Conducted study for gas/oil and water/oil relative permeability with gas flood/water flood to evaluate water/gas
         displacement efficiency; Conducted study for formation rock electrical properties/capillary pressure to evaluate
         formation rock mineral components /structure.
      Conducted study for EOR technologies in CO2, polymer and surfactant flooding with specially designated formation
         rock to evaluate displacement efficiency of EOR technology.
      Perform study for oil/water/acid compatibility/sensitivity with formation rock to identify best way of formation
         optimization and stimulation; Conducted formation damage evaluation for drilling/fracturing/acidizing fluids to
         evaluate formation damage with fluids and improvement possibility.
      Applied ultimate principle of interface and colloidal chemistry to developed new technology for heavy oil-water from
         SAGD separation without using solvent, light oil or heating.

Senior Petroleum Engineer & General Manager                                                                              1984~2005
D&P Technical Center of TuHa Oilfield, Petro-China                                                               Hami,Xinjiang,China
    Defined strategy and business plan for drilling and production engineering. Complete project with effective application
      of engineering and technical and maintenance procedure. Investigated and resolved problems in production and
      process engineering.
      Economics and technology feasibility study for technology research and development projects; Made plan and
      schedule and cost estimation for research and development projects.
      Responsible for ensuring HSSE is integrated in the procedure and execution of completion and well intervention
      operations. Actively promote HSSE and Sustainable Development (SD) in all activities and ensure compliance with
      business principles.
      Coach and mentor less experienced team members to deliver best-in-class performance in HSSE, cost, and time.
      Champion and lead a team of supervisors in tracking well costs and job timing during execution, including
      differentiating trouble costs/time from expected costs/time.
      Provide input and suggestions on service contracts to enable high performance. Manage contractor services in the field
      in line with the contracting strategy and the goals of the contract management team. Support contract management as a
      contract holder is select cases and participate as a member of the contract management team. Serve as a focal point for
      HSSE management with the contractors and the evaluation of service quality.
       Responsible for championing operational performance improvement initiatives throughout the well delivery process.
      Support the implementation of new technologies as part of the performance improvement process. Lead the
      supervisory team in implementation of opportunities to optimize operations.
      Responsible for championing operational performance improvement initiatives throughout the well delivery process.
      Support the implementation of new technologies as part of the performance improvement process. Lead the
      supervisory team in implementation of opportunities to optimize operations.
      Develop annual personal performance review/management documents including performance contracts, individual
      development plans (IDPs) and goals and performance appraisals (GPAs).
      Optimized/improved drilling and completion program technology/design and execution 1000wells; Saved 25 % costs
      of drilling/completion engineering operation.
      Supervised study and develop new technical program for small size (150 mm) directional drilling/completion for high
      water cut production well infill/design and execution 100wells. This technology made  65 million annually revenue to
      my organization.
      Identify stimulation opportunity; Studied and developed advantage technology of formation fracturing and acidizing to
      service client 1000 wells; Increased 30 % of production and get  35 million annual revenue to my organization.
      Supervised to improve operation procedure of produced water treatment battery and made a contract to client and duty
      to operate it. This project increased 10 % cost of operation in this battery and made  10 million annually revenue to
      my organization.
      Carry on pressure transmit measurement/well testing operation and adjusting Chokes flow test of light oil and gas well,
      IPR curve made and reserve evaluation. Completion 50 wells.
      Supervised and conducted measurement of produced oil and gas and water. Completed design storage and separation
      system for Oil and gas and water Oversaw and approved the design of PID and PFD of produced oil and gas separation
      and process system for two 50 million projects.
      Supervised and executed the operation of produced oil and gas and water separation and process in larger battery (close
      to 300 wells). Analyzed and optimized production oil and gas and water storage and treatment system. Ensured treated
      water to suit the qualification of re-injection of water flooding in oil field.
      Expertise for new technology of production and process studies which led to improvement production and process
      engineering operation. Hand on new chemical products and technology to flocculation and disinfect and anticorrosion
      and soften for produced waste water and viscosity reducer from CHOPS. Reduce viscosity of heavy crude oil more
      95%.
      Conducted study for EOR technologies in CO2, polymer and surfactant flooding with specially designated formation
      rock to evaluate displacement efficiency of EOR technology.


EDUCATION
B.Sc.in Chemical Engineering, (identified by IQAS)                                                              07/1984
Southwestern Petroleum University                                                                 Nanchun,Sichuan,China
Master Degree in Petroleum Engineering                                                                          12/1992
Southwestern Petroleum University                                                                 Nanchun,Sichuan,China

AFFILIATIONS
Membership of APEGA (The Association of Professional Engineers, Geologists and Geophysicists of            2011~present
Alberta)
Membership of Society of Petroleum Engineers                                                                 2007~2015

Respond to this candidate
Your Email «
Your Message
Please type the code shown in the image:
Register for Free on Jobvertise