Quantcast

Control Systems Automation Resume Terre ...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Control Systems Automation
Target Location US-IN-Terre Haute
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes

Quality Control Assurance Charleston, IL

Quality Control Assurance Champaign, IL

Customer Service Pest Control Champaign, IL

Product Manager Intern Champaign, IL

Asp.Net .Net Developer Charleston, IL

Data Warehouse Modeling Charleston, IL

Data Engineer Machine Learning Champaign, IL

Candidate's Name 1400 2nd Ave.Terre Haute, Indiana 47807Cell: PHONE NUMBER AVAILABLEEMAIL AVAILABLEEDUCATIONMS: Electronics & Computer Technology with emphasis in Automation Dec 2016BS: Automation and Control Engineering Technology May 2014Minor: Electronics TechnologyCollege of Technology: Indiana State UniversityCOURSEWORKA.C. Circuits and Design Digital Computer Logic Digital Computer Circuits Robotics and Automation Advanced Robotics and Automation Programmable Logic Controllers and Control Systems Applications of Robotic and Automation Systems Materials, Processes, and Testing Fundamentals of Manufacturing Processes Manufacturing Processes and Materials Computer Numerical Control Systems Local Area Networks Robotic Electronics Control Problems Electronics & Computer Technology Information Security Management Automation Systems Integration Analysis Technology Systems Engineering Economics AnalysisWORK EXPERIENCENAL Paris CHQ . Nov. 2019- Aug. 2023Equipment Engineer IINew launch budget planning and procurement.CAD design approvals, improvements and redesigns.Runoff troubleshooting, modifications and approvals.Liaison between vendors and final delivery.Continuous implementation of improvements through maturation.Consolidation to make room for new lines.PLC, HMI and Robotic Programing Platforms Mitsubishi, IAI, Epson and Nitto SeikoSecondary Programming Platforms vision systems, sensor applications, IAI, Allen Bradley and pneumatic applications.Control Specialist Inc. . May. 2018- Nov. 2019PLC Programming EngineerProcess Control Multi-Burner Furnace Installation and Commissioning.Calibration of controls and input sources.Conveyor ControlsServo Machine SystemsPLC Programing Platforms Allen Bradley, GE FANUC, Mitsubishi, Honeywell HC900 and Slate.Secondary Programming Honeywell UDC, Watlow, Precision Digital, VFDs, Chart Recorders etc...Print markups and CAD Corrections.Troubleshooting, designing and commissioning a wide range of control systems including water cooling and deep earth injection.Contract Work Nov. 2017- March 2018Programming and debugging.PLC Allen Bradley Logix and Micro Logix in Studio, 5000 and 500. Code creation, troubleshooting.Bar code readers and Vision Systems Keyence and Cognex setup and functionality programmingMotion Systems Allen BradleyPrint and Apply Zebra.Screwdriver Robotic Cells I/A, Allen Bradley and others troubleshooting.Robotic pick and place gantry AB, I/A multi-axis Adept, Stubli and Panasonic troubleshooting.Amazon Sept. 2015- Oct. 2017Control Systems LeadPLC Allen Bradley Logix and Micro Logix in Studio, 5000 and 500. Code creation, troubleshooting and continuous improvement.Bar code readers and Vision Systems Sick and Cognex setup, backup, settings adjustments and functionality programming.Remote I/O WAGO, Allen Bradley and ASI commissioning, troubleshooting, setup and backups.Motion Systems SEW, Emerson and Allen Bradley 40, 70, 525 commissioning, troubleshooting, setup and backups.Print and Apply Zebra Z500, PAX110 and applicators, servo tamp, pneumatic tamp troubleshooting, setup and backups.Sensors SICK, EZ Logix and Keyence commissioning, troubleshooting, setup and backups.Supervisory role over three buildings with five Technicians under me as a Lead.Setting up, scheduling, planning, tracking, reporting and implementation including arrangement of downtime coordination between contractors, team and operations.Cost analysis of projects white paper, budget, purchasing and processing inventory prior to startups.Systems analysis to gauge impact of both downtime cost and long-term effects on equipment.Approval process for Change Management and tracking of the change process.Liaison between upper management, operations and team.Advics 2015 Machine Builder (until 9/06)Internship Summer:Fabrication using prints and schematics to make any parts or modification to parts for assembly.Machine building using prints provided to build the cell to get ready for component installation.Component installation Mitsubishi Robotics RV-F, OMRON Safety Interlock, Allen Bradley Interface Sensors, Keyence Vision Cameras and light Curtains, C'More HMI installing all components in proper placing according to prints.Ensure wiring complies with OSHA, UL and NEC guidelines and prints conform to standards while wiring robot cell.Programming Testing: Assisting in programming and testing/troubleshooting of system to ensure correct functionality before release.Indiana State University Co-op Industrial Practice 2013-2014InternSemester Internship three semesters total.Semester one and two Adept robot with like controller not responsive to programming.Semester One: Mechanical: rerouting of wiring for gantry robot, pin-out of components and controller, write prints for system, fabrication of hand assembly to allow for reach outside of crash zone, extend safety barriers to accommodate for extended reach and general systems troubleshooting at board level for controller.Semester Two: troubleshoot PC program to establish connection, fix issue in virtual drive renaming, program controller with proper interlocks between two robot cells, loading gantry robot being fixed by another team and conveyance between stations, three phase drive motor replacement, Program logic in V++ (Adept system that uses Cartesian coordinates, hand position, If Then and For While statements) and troubleshoot functionality for releaseSemester Three: FANUC robot and three axes milling unit.Rebuild of servo for second axis, Rebuilding and replacing components for milling machine, pin-out on milling machine to replace old motor controllers with a safety interlock relay with VFD system for more precise control.Carter 4D Construction 1999 2012Plumbing/Electrical (and working at temporary agencies during seasonal downtime).Plumbing/Electrical Residential for refurbishing and remodel jobs.Complete tear out, bidding, supply purchasing and replacement.Volunteer Ryves Hall and Homeowners Association 1999 - 2010IT/Computers and NetworksIT/Computers and NetworksBuilding, troubleshooting and programming of computers.Running and troubleshooting existing infrastructureReferences, Transcripts and Letters of Recommendation upon request.

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise